Profit on the Floor calculators

Five quick calculators for injection molders: OEE, the real cost of scrap, what changeovers cost, what a second of cycle time is worth, and what a press really costs per hour. Enter your own numbers. The example values are hypothetical.

These are self-assessment tools for your own use. They aren't an engagement result, a benchmark, or a guarantee. Nothing you type is stored or sent anywhere.

Free. No email required.

OEE for one press and one job over one period. Use the quoted or validated standard cycle as the ideal cycle, not the best cycle anyone has ever seen. Count every shot that came off the press as total parts, including startup scrap.

Scheduled hours for this job in the period.

Stops, changeovers, waiting on material or people.

Results

Availability
88.3%
Performance
95.4%
Quality
96.9%
OEE
81.7%
Parts possible at standard
54,514

The lowest of the three factors usually shows where to look first. Performance above 100% means the standard cycle is out of date.

Looking at press capacity before buying another machine? Try the Press Capacity Check worksheet.