Field notes from the plant floor.
Practical writing for owners and operators — on scrap, uptime, tooling, valuation, and the operational habits that hold gains.
Profit on the Floor calculators
Five free calculators for injection molders: OEE, scrap cost, changeover cost, the value of a second of cycle time, and machine-hour rate. Use your own numbers; nothing is stored.
Read the article →How to calculate injection molding press capacity
Work out good parts per scheduled hour from cycle time, cavities, run time, and yield, then check which capacity is usable before buying a press.
Read the article →How to reduce injection molding scrap without major capital investment.
What appears to be a scrap problem is often a variation problem somewhere else in the molding system. Measure, stratify, and correct — before spending capital.
Read the article →Why profits hide on the production floor — and how to find them
The most visible problem may be a symptom of a constraint somewhere else in the system. Where margin is lost in routine operating decisions.
Read the article →Hidden profits: the Profitability Stack™
Scrap, cycle and uptime, compliance and risk, culture and execution, enterprise value — how the five layers interact as one manufacturing system.
Read the article →Manufacturing due diligence for buyers and sellers
What to assess on the factory floor before a deal closes — and how operating findings can inform valuation assumptions and capex planning.
Read the article →The Profitability Stack™: where injection molders find hidden EBITDA
How scrap control, cycle and uptime, compliance and risk, culture and execution, and enterprise value build on one another — connecting operating performance to financial performance.
Read the article →Injection molding quality control and assurance
Part requirements, mold condition, process windows, material handling, measurement, and standard work — how a controlled manufacturing system produces consistent quality.
Read the article →Bring the questions from these articles to a real conversation.
Book a 30-minute consultation and we'll apply the same thinking directly to your operation.
Schedule a 30-minute Executive Manufacturing Performance ReviewA 30-minute call with Jon Gaylord, an experienced manufacturing executive, about the problem or decision in front of you.